UP 2013.04.06 12:00 UTC

On 6 April 2013 at 12:00 UTC we will synchronize the production repositories.
Those who haven’t upgraded from the testing repositories will have about 250MB of packages to download.

We’ll make the RC iso’s available, after we confirmed that the synchronization was successful.

This is the first time we execute this process. So, please be patient if not all goes as smooth as expected.
As we’re running the site, this forum, the repositories and some other servers on the same machine, you might have a slow download if people upgrade at the same time. Try again at a later date or time.

You can post your findings, or get help here: http://forums.solydxk.com/viewtopic.php?f=32&t=388

Leave a Reply